With the release of the 2012 Industrial General Stormwater Permit (IGP) the Georgia Environmental Protection Division (EPD) introduced the Smoke and Dye Testing requirement for any facility with sinks and floor drains in industrial areas that were installed prior to 2006. This requirement was rolled over into the 2017 IGP when it was released in June 2017 that all applicable permittees should conduct the Smoke and Dye Testing prior to the end of the permit cycle which is schedule to be May 30, 2022.
Continue reading “What is a Smoke & Dye Test and Why is it Required?”