With the release of the EPA’s 2021 Stormwater Multisector General Permit (MSGP), the GA EPD, like many other states, is planning to adopt significant changes from the 2021 EPA MSGP to their Industrial General Permit (IGP) in May of 2022. These changes will apply to most if not all industry sectors covered under the current 2017 IGP. The EPD has confirmed the following as the “most significant changes” that have been added to the draft permit: Continue reading “Georgia Set To Release New General Stormwater Permit in 2022”